How to calculate board and batten
Boards = (wall width + gap) ÷ (board width + gap), rounded up
Battens = boards − 1, one over each gap
Battens over panels = wall width ÷ spacing, rounded up, + 1
Nails = pieces × nailing lines × nails per line
Example: a 16 × 8 ft wall in 1 × 10 boards and 1 × 3 battens, with 1/2 in gaps.
- A 1 × 10 is 9 1/4 in wide and a 1 × 3 is 2 1/2 in, once dried and planed
- Boards: (192 + 0.5) ÷ (9.25 + 0.5) = 19.7, so 20 boards; the last is ripped to fit
- Battens: one per gap, 19
- 8 ft pieces reach the top, so 20 boards and 19 battens of 8 ft: 160 and 152 linear feet
- Nailing lines every 24 in up an 8 ft wall: 5, top and bottom included
- Nails: 20 × 5 × 2 + 19 × 5 = 295, so about 300
Two ways to build it
Boards and battens. The traditional siding: wide vertical boards with a narrow gap between them, and a batten over each gap. The Western Red Cedar Lumber Association suggests 1 × 10 boards with 1 × 3 battens; its overlap rule spaces 6 in boards 1/2 in apart, with each batten lapping at least 1/2 in onto the boards, and more on wider ones. Nail to horizontal blocking or furring at most 24 in apart: one nail per board per line on boards up to 6 in, two on wider boards, and one per batten, driven through the gap.
Battens over panels or drywall. The panel-and-batten look: sheets of panel siding, or a painted drywall accent wall, with battens on top at a regular spacing. LP’s panel siding comes 4 ft wide, so a spacing that divides 48 in (12, 16 or 24 in on center) lands a batten on every joint; 16 in also lines up with studs 16 in on center. LP’s trim instructions call for a nail at least every 24 in up battens under 3 in wide (two per line on wider trim), and say to stop battens above and below a horizontal panel joint rather than run them over it, so on walls over 10 ft the calculator cuts them there.
Sizes
| Nominal | Actual width |
|---|---|
| 1 × 2 | 1 1/2 in |
| 1 × 3 | 2 1/2 in |
| 1 × 4 | 3 1/2 in |
| 1 × 6 | 5 1/2 in |
| 1 × 8 | 7 1/4 in |
| 1 × 10 | 9 1/4 in |
| 1 × 12 | 11 1/4 in |
Dry dressed widths from the USDA Wood Handbook; cedar and rough-sawn boards can differ, so measure yours. Doors and windows aren’t taken off: the boards cut around them still have to be bought. For lap or vinyl siding, use the siding calculator; for the soffit under the eaves, the soffit calculator.
Accent walls
For battens over drywall, the spacing is a design choice rather than a rule, so the calculator can work from the number of battens instead. It puts one at each end, flush with the wall’s ends, and spreads the rest evenly: on center = (wall width − one batten width) ÷ (battens − 1), and the clear gap is that less one batten width. Mark the on-center spacing from one end and check the last batten lands flush before you nail. Over panel siding, keep a spacing that divides 48 in instead, so a batten covers every joint.