The sheet layout
On a 16 ft wall 8 ft high, two rows of 4 ft high sheets cover it: a 12 ft and a 4 ft sheet in each row, swapped between the rows so the joints don’t line up. Every joint lands on a stud, and the tapered long edges meet in the middle of the wall, where the tape and compound fill the recess.
Hanging, then finishing
USG’s guide covers hanging; its joint compound sheet covers finishing. The short version of each:
| Stage | What USG says |
|---|---|
| Order | Ceilings first, then walls, top row first |
| Screws | Ceilings at most 12 in apart, walls 16 in, 3/8 in from edges, just below the surface |
| Joints | Stagger vertical joints; none directly above or below doors and windows |
| Tape | Thin layer of compound, paper tape bedded in it, about 1/32 in left under the edges |
| Coats | Second and third coats, each feathered about 2 in wider; at least three on fasteners and corners |
| Prime | Whole surface, once dry and dust-free |
The spacing above is USG’s for walls and ceilings that are not fire-rated. For how smooth the finish needs to be under a given paint or texture, USG refers to the Gypsum Association’s GA-214, Levels of Finish.
Supplies for a 12 × 12 ft room
With 8 ft walls and the ceiling, the room has 528 sq ft of board: 19 sheets of 4 × 8 ft with 10% extra. At USG’s rates that’s about 1.4 lb of screws (the calculator counts about 500), 5.3 gallons of ready-mixed compound (two 4.5 gallon pails) and about 195 ft of tape, one 250 ft roll. Hung, taped and finished by a pro, it typically costs about $1,320 ($792 to $1,848) at national averages.